SOCIAL INFRASTRUCTURE

  • A meticulously planned township incorporated with the best economic drivers such as employment opportunities, great social infrastructure and luxurious lifestyle quotients.
  • In the vicinity of multinational manufacturing companies and upcoming projects with high profit yield.
  • Connected with important satellite towns a round Bangalore.
  • Warehouse is located on off Hoskote Tirupati Highway, Bangalore
  • Total Project Value - INR 2,625 Crores* / USD 375 million*
  • Land Extent - 15.25 million Sq.ft
  • Total Built up Area - 8.75 million Sq.ft
  • Ground coverage - 4.37 million Sq.ft
  • Mezzanine - 0.88 million Sq.ft
  • Rental Income (INR / Sq. ft) Ground Coverage - 20 per sq. ft*
  • Rental Income (INR / Sq. ft) Mezzanine - 12 per sq.ft*

*Figures can vary with market conditions.

AMENITIES

R.C.C. Roads
24x7 Electricity
Storm Water
Fire Fighting
24x7 Water
Public Transport
24x7 Security
Sewage Treatment Plants
Truck Terminals
CCTV Cameras
Wi-Fi Zone
Street Furniture
Loading & Unloading
Weighbridge
Street Lights
Fuel Station
Dormitory
Canteen
Admin Building
Ample Parking & Landscape
Medical Center
Common Toilet

Specifications

Building Structure Height: 12 m clear at the eaves level
Bay Spacing:
End: Between 7.5 m to 7.75 m multiples
Intermediate: Between 15 m to 15.5 m multiples
Span: 24 m to 27.5 m
Loading Parameters: As per the applicable MBMA Standards and deflection criteria as per India Standards
Collateral Load: 25 Kg/Sq.m.
Roofing: bare Galvalume standing seam with thickness 0.50 mm TCT
Roof natural lighting of 4% with polycarbonate sheet
4 m wide cantilever canopy on docking side with the clear height of 5 m from the apron level
Docking Loading and Unloading area:
Between 25 to 28 m for one side
Between 42 to 47 m for back to back loading area
16.5 m apron with paver block done
Dock Height: 1.2 m with RCC Wall
Internal Docking
Provision of Dock Pits: 1 for every 30,000 sq.ft.
Flooring Drive in Door Size: 4 m*5.5 m
Distributed load of 7 tonne per sq.m.
Ventilation System FM 2 Floor Tolerances
4-6 Air Changes / Hour
Ridge Monitor at the roof level/louvers
Electrical Works 3 phase power supply
Fire Fighting System Fire extinguishers for the common areas
Fire hose stations
Sprinkler system